APPROVAL FROM THE OWNERS OF THE CANAL!!
I went to my chosen site and counted the amount of people that I saw there...
In the space of 5 minutes I counted:
5 bikes
1 runner
45
3 bikes
This shows that the site is a very busy place
5 bikes
1 runner
45
3 bikes
This shows that the site is a very busy place
I then talked to a lady who was by the site from the Canal & River Trust who informed me about the canal and the work that they were doing there...
She told me that in that area, they would on average see around 1000 people per day pass that part of the site.
The area belonging to the canal stretches a total of 2000 miles.
They have to replace the canal lock every 4 years at a cost of £80,000 each time.
The Canal & River Trust took over from British Waterways 2 years ago and in that time they have got onto of the pollution completely. They are also very keen to introduce more wildlife to the area and look after the nature of the site, as well as provide more of it.
She was very keen on my idea for the bridge, happy that the natural nature of it would fit in well with the aims of the Canal & River Trust. She was very approving of my proposal.
The area belonging to the canal stretches a total of 2000 miles.
They have to replace the canal lock every 4 years at a cost of £80,000 each time.
The Canal & River Trust took over from British Waterways 2 years ago and in that time they have got onto of the pollution completely. They are also very keen to introduce more wildlife to the area and look after the nature of the site, as well as provide more of it.
She was very keen on my idea for the bridge, happy that the natural nature of it would fit in well with the aims of the Canal & River Trust. She was very approving of my proposal.